Whirlpool FFWDD 107448 WBS IT
6 pieces in stock at supplier
Product details
The Whirlpool FreshCare FFWDD 107448 WBS IT is a versatile washer-dryer designed for efficient and gentle care of your laundry. With a nominal capacity of 7 kg for drying and 10 kg for washing, this appliance provides ample space for various laundry loads. The maximum spin speed of 1400 RPM ensures effective water removal, while the spin efficiency class B guarantees good performance. The washer-dryer is freestanding and features a simple white design, allowing it to fit into any environment. Equipped with a remaining time display and a child lock, the appliance offers added safety and user-friendliness. The various washing programs, including special options for delicate fabrics and jeans, allow for individual customization to meet your laundry needs. With an annual energy consumption of 281 kWh and an energy efficiency class of C, the FFWDD 107448 WBS IT is an environmentally conscious choice for the modern household.
- Remaining time display for better laundry care planning
- Child lock for added safety
- Various washing programs, including delicate and jeans
- Maximum spin speed of 1400 RPM for efficient spinning
- Drum volume of 71 liters for larger laundry loads.
Washing capacity | 10 kg |
Drying capacity | 7 kg |
Energy efficiency class | C |
Width | 59.50 cm |
Depth | 60.50 cm |
Height | 85 cm |
Item number | 59966503 |
Manufacturer | Whirlpool |
Category | Washer-dryers |
Manufacturer No. | 869991707320 |
Release date | 5.7.2025 |
Colour | White |
Door colour | Black, Grey |
Material group | Metal, Plastic |
Washing capacity | 10 kg |
Drying capacity | 7 kg |
Washing program | Coloured laundry, Cotton, Delicates, Down, Eco 40-60°C, Jeans/denim, Pumps/Spinners, Quick 30min, Sinks, Spin, Steam function, Wool |
Washer-dryer features | Child-proof lock, Remaining time display, Start time preselection |
Spin efficiency class | B |
Mounting | Stand-alone |
Door hinge | Left |
Spinning noise level | 79 dB |
Mains voltage | 220 - 240 V |
Energy consumption per year | 281 kWh |
Water consumption per wash cycle | 45 l |
Cable length | 1.20 m |
Energy efficiency class | C |
Smart home | Not compatible |
Manufacturer commitment | SBTi |
CO₂ emissions | 165,76 kg |
Climate contribution | EUR 4,13 |
Width | 59.50 cm |
Depth | 60.50 cm |
Height | 85 cm |
Weight | 73.40 kg |
Drum volume | 71 l |
30-day right of return