Kung Long Lead accumulator WP3.3-12, 12 V-/3.3 Ah
12 V, 3.30 AhPrice in EUR including VAT
Delivered Tue, 19.5.
5 pieces in stock at third-party supplier
5 pieces in stock at third-party supplier
Supplied by
Pollin DE
Free shipping starting at 30,–
Product details
Maintenance-free lead battery with high operational safety and low self-discharge.
Technical data:
- Nominal voltage: 12 V
- Capacity: 3.3 Ah
- Max. discharge current: 132 A (5 seconds)
- Blade terminal: 4.8 mm
- Operating temperature range.
Battery technology | AGM |
Voltage | 12 V |
Capacity | 3.30 Ah |
Length | 134 mm |
Width | 59.90 mm |
Item number | 38928463 |
Manufacturer | Kung Long |
Category | Leisure batteries |
Manufacturer No. | WP3.3-12 |
Release date | 27.9.2023 |
Battery type | Supply battery |
Battery technology | AGM |
Voltage | 12 V |
Capacity | 3.30 Ah |
Starting current at 0°C | 132 A |
Terminal type | 4 (flat poles) |
Gas discharge | Not required |
Delivery condition | Ready for immediate use (Filled & Loaded) |
Battery category | Industry battery |
Battery | Battery |
Battery type | Lead–acid battery |
Country of origin | China |
CO₂ emissions | 16,89 kg |
Climate contribution | EUR 0,42 |
Scope of delivery | 1 piece |
Items per sales unit | 1x |
Length | 134 mm |
Width | 59.90 mm |
Height | 107 mm |
Product Safety |
Specifications may include unverified machine translations.
14-day cancellation right
30-day right of return
30-day right of return
24 Months statutory warranty
Legal concerns