Kung Long Lead-acid battery, 12V-/26Ah, VdS WP26-12
12 V, 26 AhPrice in EUR including VAT
Delivered between Mon, 1.6. and Tue, 2.6.
Only 3 pieces in stock at third-party supplier
Only 3 pieces in stock at third-party supplier
Supplied by
Pollin DE
free shipping
Product details
VdS-tested, maintenance-free lead battery. High operational safety due to low self-discharge. Ideal for use in security technology, alarm technology, medical technology, industry, hobbies, etc.
Technical data:
- Nominal voltage 12 V.
Voltage | 12 V |
Capacity | 26 Ah |
Length | 166 mm |
Width | 125 mm |
Item number | 37387152 |
Manufacturer | Kung Long |
Category | Leisure batteries |
Manufacturer No. | WP26-12 |
Release date | 6.8.2023 |
Battery type | Supply battery |
Voltage | 12 V |
Capacity | 26 Ah |
Gas discharge | Not required |
Safety Approval | Device battery with VdS approval |
Battery category | Industry battery |
Battery | Battery |
Battery type | Lead–acid battery |
Power capacity | 312 Wh |
Country of origin | China |
CO₂ emissions | 16,89 kg |
Climate contribution | EUR 0,42 |
Length | 166 mm |
Width | 125 mm |
Height | 175 mm |
Product Safety |
Specifications may include unverified machine translations.
14-day cancellation right
30-day right of return
30-day right of return
24 Months statutory warranty
Legal concerns