Your data. Your choice.

If you select «Essential cookies only», we’ll use cookies and similar technologies to collect information about your device and how you use our website. We need this information to allow you to log in securely and use basic functions such as the shopping cart.

By accepting all cookies, you’re allowing us to use this data to show you personalised offers, improve our website, and display targeted adverts on our website and on other websites or apps. Some data may also be shared with third parties and advertising partners as part of this process.

Kung Long Lead-acid battery, 12V-/36Ah, U1-36NE

12 V, 36 Ah
Price in EUR including VAT
Delivered between Thu, 9.4. and Fri, 10.4.
Only 2 pieces in stock at third-party supplier
Supplied by
Pollin DE
free shipping

Product details

The 12V/36Ah U1-36NE lead-acid battery is a maintenance-free gel battery that is characterized by its position-independent use. It is suitable for a wide range of applications, making it a versatile power source. With a nominal voltage of 12 volts and a capacity of 36 ampere-hours, it provides reliable performance for various devices and applications. The battery is ready for immediate use as it is delivered pre-filled and charged. Its robust construction and AGM technology ensure a long lifespan and reliability, even under demanding conditions.

  • Maintenance-free and position-independent
  • AGM technology for high reliability
  • Ready for immediate use, pre-filled and charged
  • Maximum charging current of 10.8 A.

Key specifications

Battery technology
AGM
Voltage
12 V
Capacity
36 Ah
Length
159 mm
Width
131 mm

General information

Item number
37260517
Manufacturer
Kung Long
Category
Leisure batteries
Manufacturer no.
U1-36NE
Release date
27.7.2023

Supply battery features

Battery type
Supply battery
Battery technology
AGM
Voltage
12 V
Capacity
36 Ah
Terminal type
M06
Gas discharge
Not required
Delivery condition
Ready for immediate use (Filled & Loaded)

Battery properties

Battery category
Device batteries
Battery
Battery

Origin

Country of origin
China

Voluntary climate contribution

CO₂ emissions
16,89 kg
Climate contribution
EUR 0,42

Scope of delivery

Items per sales unit
1x

Product dimensions

Length
159 mm
Width
131 mm
Height
197 mm

Legal Notice

Product Safety

14-day cancellation right
30-day right of return
24 Months statutory warranty
Legal concerns

Compare products

Goes with

Reviews & Ratings