Kung Long Lead-acid battery, 12V-/50Ah WP50-12NE
12 V, 50 AhPrice in EUR including VAT
Delivered between Wed, 8.4. and Thu, 9.4.
Only 1 piece in stock at third-party supplier
Only 1 piece in stock at third-party supplier
Supplied by
Pollin DE
free shipping
Product details
Cycle-resistant lead-acid battery from the KUNG LONG series. The battery is maintenance-free and features a robust construction.
Technical specifications:
- Nominal voltage 12 V
- Capacity 50 Ah
- Max. discharge current 600 A (5 seconds)
- Operating temperature range.
Battery technology | Lead-Acid WET |
Voltage | 12 V |
Capacity | 50 Ah |
Length | 166 mm |
Width | 171 mm |
Item number | 37260346 |
Manufacturer | Kung Long |
Category | Leisure batteries |
Manufacturer no. | WP50-12NE |
Release date | 27.7.2023 |
Battery type | Supply battery |
Battery technology | Lead-Acid WET |
Voltage | 12 V |
Capacity | 50 Ah |
Gas discharge | Not required |
Delivery condition | Ready for immediate use (Filled & Loaded) |
Battery category | Industry battery |
Battery | Battery |
Battery type | Lead–acid battery |
Country of origin | Taiwan |
CO₂ emissions | 16,89 kg |
Climate contribution | EUR 0,42 |
Items per sales unit | 1x |
Length | 166 mm |
Width | 171 mm |
Height | 198 mm |
Product Safety |
Specifications may include unverified machine translations.
14-day cancellation right
30-day right of return
30-day right of return
24 Months statutory warranty
Legal concerns