Berlin Central Station
Only 3 pieces in stock at supplier
Product details
Just in time for the start of the FIFA World Cup in Germany in 2006, the extensive renovation and new construction of the railway network in the center of Berlin was completed. This major project of the Berlin Central Station was thus finalized: the formerly quiet Lehrter Stadtbahnhof transformed into the central transfer station of the capital – one of the most impressive railway structures in the world in recent decades. This title addresses the progress and setbacks of this project, including the current storm damage from the winter of 2007, revealing both interesting and pressing backgrounds.
Item number | 35141280 |
Publisher | Motorbuch |
Category | Model railway buildings |
Release date | 17.5.2023 |
CO₂-Emission | |
Climate contribution |
30-day right of return
Compare products
Goes with
Reviews & Ratings
Statutory warranty score
How often does a product of this brand in the «Model railway buildings» category have a defect within the first 24 months?
Source: Galaxus- MotorbuchNot enough data
- 1.Busch0 %
- 1.Noch0 %
- 3.Bachmann Trains0,1 %
- 3.Faller0,1 %
Statutory warranty case duration
How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?
Source: Galaxus- MotorbuchNot enough data
- 1.Faller0 days
- Army PainterNot enough data
- Bachmann TrainsNot enough data
- BuschNot enough data
Return rate
How often is a product of this brand in the «Model railway buildings» category returned?
Source: Galaxus- MotorbuchNot enough data
- 1.Army Painter0 %
- 1.LGB0 %
- 3.Bachmann Trains0,6 %
- 3.Märklin0,6 %