Kung Long Lead acid battery suitable for Tyco Navigator GPS type E097113
2000 mAhPrice in EUR including VAT, free shipping
Delivered between Wed, 2.7. and Thu, 17.7.
Supplied by
Akkushop.de DE
Product details
Lead-acid battery suitable for Tyco Navigator GPS, type E09711312. Voltage: 12 Volt. Capacity: 2.0 Ah. Approximate dimensions: 140 x 23 x 60 mm. Approximate weight: 0.65 kg. Not original.
Battery type | Lead–acid battery |
Voltage | 12 V |
Item number | 39074102 |
Voltage | 12 V |
Battery type | Lead–acid battery |
Battery capacity | 2000 mAh |
CO₂-Emission | |
Climate contribution |
Weight | 650 g |
Ingredients | Lead-acid battery suitable for Tyco Navigator GPS, type E09711312 Volt 2,0 Ah - approx. dimensions in mm 140x23x60 - approx. weight 0,65 kgNot original - Voltage: 12 Volt- Capacity: 2,0 Ah- Not original. |
Specifications may include unverified machine translations.
14-day cancellation right
30-day right of return if unopened
30-day right of return if unopened
24 Months Statutory warranty
Compare products
Goes with
Reviews & Ratings
Statutory warranty score
How often does a product of this brand in the «Batteries» category have a defect within the first 24 months?
Source: Galaxus- Kung LongNot enough data
- 1.AccuCell0 %
- 1.Duracell0 %
- 1.Emos0 %
- 1.Energizer0 %
Statutory warranty case duration
How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?
Source: Galaxus- Kung LongNot enough data
- 1.Ansmann0 days
- 1.Camelion0 days
- 1.Coast0 days
- 1.Duracell0 days
Return rate
How often is a product of this brand in the «Batteries» category returned?
Source: Galaxus- Kung LongNot enough data
- 1.Blaupunkt0 %
- 1.HW0 %
- 1.Murata0 %
- 1.Ultralife0 %
Source: Galaxus