Eltako Three-phase meter MID calibrated

Price in EUR including VAT, free shipping

Product details

Only calibrated meters are approved for electricity billing in accordance with §25 of the German calibration law. Non-compliance is an administrative offence according to §19.
maximum current 3x80A, standby loss only 0.5 Watt per path. Modular device for DIN-EN 60715 TH35 rail mounting. 4 modules = 70mm wide, 58mm deep. Accuracy class B (1%). With S0 interface. The directly measuring three-phase meter measures the active energy on the basis of the currents flowing between the inputs and outputs. The internal consumption of only a maximum of 0.5W active power per path is not measured and is not displayed. 1, 2 or 3 phase conductors with currents up to 80A can be connected. The starting current is 4OmA. The N connection must be available. The 7-segment LC display can be read twice within two weeks even without power supply. The power consumption is indicated on the display by a bar flashing 100 times per kWh. Can also be used as a 2-tariff meter as standard: With application of v.

Key specifications

measurement module
Kilowatt hours
Maximum current
80 A
Colour
Blue
Energy meter type
Energy meter
mounting style
Top-hat rail
Item number
12747518

General information

Manufacturer
Category
Energy monitors
Manufacturer no.
28380015
Release date
2/17/2020
Sales rank in Category Energy monitors

Colour

Colour group
Blue
Exact colour description
Blue

Energy meter property

Energy meter type
Energy meter
mounting style
Top-hat rail
measurement module
Kilowatt hours
Maximum current
80 A
Display type
Digital

Safety

Protection type (IP code)
IP20

Product dimensions

Height
58 mm
Length
58 mm
Width
70 mm
Weight
0.90 g

Package dimensions

Length
10 cm
Width
9 cm
Height
7 cm
Weight
240 g

Here you can see the lowest price of the day over time. Learn more

14-day cancellation right
30-day right of return
Return policy
2 additional offers

Reviews & Ratings