Schneider Electric A9MEM2455 - Energy meter 1-phase 100 A 2 S0 MID Modbus

Price in EUR including VAT
Delivered between Fri, 22.8. and Fri, 29.8.
Supplied by
free shipping

Product details

AC meter for direct measurement up to 100 A, calibrated offset metering (MID-compliant). Two tariff controls via command register, partial counter with reset function, extended measuring function for active and reactive energy (consumption and output), current, voltage, active and reactive power, power factor, and frequency. Accuracy class 1 (IEC 62053-21 and IEC 61557-12) or class B (EN 50470-3). Communication via Modbus. Top-hat rail mounting (2TE). 8-digit LCD display and a red LED display to show the measured electrical parameters. Product dimensions: width 35.8 mm, depth 63 mm, height 96.71 mm, and product weight 220 g. Operating temperature: -25 to +55 °C. Power supply: self-supply 10 VA. Protection class: front IP 51, housing IP 20.

Key specifications

Maximum current
100 A
Energy meter type
Energy meter
mounting style
Top-hat rail
Nominal voltage
195 V
Item number
38856728

General information

Manufacturer
Schneider Electric
Category
Energy monitors
Manufacturer no.
A9MEM2455
Release date
26.9.2023

Energy meter property

Energy meter type
Energy meter
mounting style
Top-hat rail
Maximum current
100 A
Nominal voltage
195 V
Display type
Digital
Tariff execution
Second tariff
Pulse output
Electrical
Polar type
1-phase
Accuracy class
B

Safety

Protection type (IP code)
IP20

Origin

Country of origin
China

Voluntary climate contribution

CO₂-Emission
Climate contribution

Product dimensions

Height
96.71 mm
Length
63 mm
Width
35.80 mm

14-day cancellation right
30-day right of return
24 Months statutory warranty

Compare products

Goes with

Reviews & Ratings

Statutory warranty score

How often does a product of this brand in the «Energy monitors» category have a defect within the first 24 months?

Source: Galaxus
  • Schneider Electric
    Not enough data
  • 1.Orno
    0,1 %
  • 1.Voltcraft
    0,1 %
  • 3.Max Hauri
    0,3 %
  • 4.Brennenstuhl
    0,5 %

Statutory warranty case duration

How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?

Source: Galaxus
  • Schneider Electric
    Not enough data
  • 1.Shelly
    1 day
  • Brennenstuhl
    Not enough data
  • Eltako
    Not enough data
  • Goobay
    Not enough data

Return rate

How often is a product of this brand in the «Energy monitors» category returned?

Source: Galaxus
  • Schneider Electric
    Not enough data
  • 1.Janitza
    0 %
  • 1.Orno
    0 %
  • 3.Qoltec
    1,2 %
  • 4.Brennenstuhl
    1,4 %
Source: Galaxus