Your data. Your choice.

If you select «Essential cookies only», we’ll use cookies and similar technologies to collect information about your device and how you use our website. We need this information to allow you to log in securely and use basic functions such as the shopping cart.

By accepting all cookies, you’re allowing us to use this data to show you personalised offers, improve our website, and display targeted adverts on our website and on other websites or apps. Some data may also be shared with third parties and advertising partners as part of this process.

Voltcraft WBS-120 Thermal imaging camera -20 to 400°C 120 x 90 pixels 25Hz USB-C® connection for Android

Price in EUR including VAT
Delivered between Mon, 16.3. and Wed, 18.3.
More than 10 pieces in stock at supplier
free shipping

Product details

The VOLTCRAFT WBS-120 thermal imaging camera is a compact and powerful device designed for mobile use. With a temperature measurement range of -20 to 400 °C, this handheld thermal camera is ideal for various applications, from building diagnostics to checking electrical installations. The camera features a pixel resolution of 120 x 90 pixels and a frame rate of 25 Hz, allowing for smooth and precise representation of thermal images. Thanks to the USB-C® connection, the camera is compatible with Android devices, enabling easy connection and data transfer. Weighing only 21 grams, the WBS-120 is lightweight and portable, making it a practical tool for professionals and hobbyists who need a mobile solution for thermal analysis.

  • Thermal sensitivity of 50 mK for precise temperature measurements
  • Autofocus function for sharp and clear images
  • Vertical and horizontal field of view of 50 degrees each
  • USB power supply for easy handling
  • Package includes a carrying case and user manual.

Key specifications

Thermal imaging camera type
Mobile phone thermal imaging camera
Temperature measuring range min.
-20 °C
Temperature measuring range max.
400 °C
Image resolution
120 x 90 Pixels

General information

Item number
42071378
Manufacturer
Voltcraft
Category
Thermal imaging cameras
Manufacturer no.
VC-14378990
Release date
12.1.2024

Thermal imaging camera features

Thermal imaging camera type
Mobile phone thermal imaging camera
Temperature measuring range min.
-20 °C
Temperature measuring range max.
400 °C
Measurement accuracy
3 °C
Thermal sensitivity (NETD)
50 mK
Horizontal field of view
50°
Focus type
Autofocus
Refresh rate
25 Hz
Image sensor resolution
10800 Pixel
Image resolution
120 x 90 Pixels
Interfaces / communication module
USB
USB connector type
USB-C
Functionalities
Photograph

Power supply

Power supply
USB power delivery

Origin

Country of origin
China

Voluntary climate contribution

CO₂ emissions
1,39 kg
Climate contribution
EUR 0,12

Scope of delivery

Scope of delivery
ManualTote bag

Product dimensions

Length
2.80 cm
Height
5.20 cm

Legal Notice

Product Safety

14-day cancellation right
30-day right of return
24 Months statutory warranty
1 additional offer
Legal concerns

Compare products

Goes with

Reviews & Ratings

Statutory warranty score

How often does a product of this brand in the «Thermal imaging cameras» category have a defect within the first 24 months?

Source: Galaxus
  • 1.Voltcraft
    0,2 %
  • 2.Uni-T
    0,9 %
  • 3.Bosch Professional
    1 %
  • 3.Flir
    1 %
  • 5.Hikmicro
    1,2 %

Statutory warranty case duration

How many working days on average does it take to process a warranty claim from when it arrives at the service centre until it’s back with the customer?

Source: Galaxus
  • Voltcraft
    Not enough data
  • 1.Hikmicro
    1 day
  • 2.Flir
    2 days
  • 3.SeeK
    8 days
  • 4.Pulsar
    16 days

Return rate

How often is a product of this brand in the «Thermal imaging cameras» category returned?

Source: Galaxus
  • 2.Bosch Professional
    2,8 %
  • 3.Hikmicro
    5,3 %
  • 4.Voltcraft
    7,2 %
  • 5.Uni-T
    7,6 %
  • 6.Flir
    9,2 %
Source: Galaxus