Kung Long Lead accumulator WP2.9-12, 12 V-/2.9 Ah
12 V, 2.90 AhPrice in EUR including VAT
Delivered between Thu, 18.9. and Fri, 19.9.
7 pieces in stock at third-party supplier
7 pieces in stock at third-party supplier
Supplied by
Pollin DE
Free shipping starting at 30,–
Capacity9
Product details
Maintenance-free lead battery with high operational safety and low self-discharge.
Technical data:
- Nominal voltage: 12 V
- Capacity: 2.9 Ah
- Max. discharge current: 58 A (5 seconds)
- Blade terminal: 4.8 mm
- Operating temperature range:.
Voltage | 12 V |
Capacity | 2.90 Ah |
Item number | 38928426 |
Manufacturer | Kung Long |
Category | Leisure batteries |
Manufacturer no. | WP2.9-12T |
Release date | 27.9.2023 |
Vehicle | Accessories |
Battery type | Supply battery |
Voltage | 12 V |
Capacity | 2.90 Ah |
Battery category | Device batteries |
Battery | Rechargeable battery |
Battery type | Lead–acid battery |
Country of origin | Vietnam |
CO₂-Emission | |
Climate contribution |
Items per sales unit | 1 x |
Product Safety |
Specifications may include unverified machine translations.
14-day cancellation right
30-day right of return
30-day right of return
24 Months statutory warranty