Kung Long Lead-acid accumulator WP2.2-12, 12 V-/2.2 Ah
12 V, 2.20 AhPrice in EUR including VAT
Delivered between Thu, 18.9. and Fri, 19.9.
More than 10 pieces in stock at third-party supplier
More than 10 pieces in stock at third-party supplier
Supplied by
Pollin DE
Free shipping starting at 30,–
Capacity9
Product details
VdS-tested, maintenance-free lead battery. High operational safety due to low self-discharge. Ideal for use in security technology, alarm technology, medical technology, industry, hobbies, etc.
Technical data:
- Nominal voltage 12 V.
Voltage | 12 V |
Capacity | 2.20 Ah |
Item number | 38925426 |
Manufacturer | Kung Long |
Category | Leisure batteries |
Manufacturer no. | WP2.2-12 |
Release date | 27.9.2023 |
Battery type | Supply battery |
Voltage | 12 V |
Capacity | 2.20 Ah |
Battery category | Device batteries |
Battery | Rechargeable battery |
Battery type | Lead–acid battery |
Country of origin | China |
CO₂-Emission | |
Climate contribution |
Product Safety |
Specifications may include unverified machine translations.
14-day cancellation right
30-day right of return
30-day right of return
24 Months statutory warranty