Your data. Your choice.

We use cookies and similar technologies to provide you with the best shopping experience as well as for marketing purposes. Please accept, decline or manage the use of your information.

Kung Long Lead accumulator WP5-12E, 12 V-/5 Ah, cycle-proof

12 V, 5 Ah
Price in EUR including VAT
Delivered between Thu, 18.9. and Fri, 19.9.
More than 10 pieces in stock at third-party supplier
Supplied by
Pollin DE
Free shipping starting at 30,–

Product details

Maintenance-free, position-independent lead-fleece battery with a wide range of applications.

Technical data:

  • Nominal voltage: 12 V
  • Nominal capacity: 5 Ah
  • Charging current: max. 1.5 A
  • Connection: 6.3 mm cable lug
  • Operating temperature:.

Key specifications

Battery technology
Lead Acid Gel
Voltage
12 V
Capacity
5 Ah
Item number
38931615

General information

Manufacturer
Kung Long
Category
Leisure batteries
Manufacturer no.
WP5-12E
Release date
27.9.2023

Supply battery features

Vehicle
Accessories
Battery type
Supply battery
Battery technology
Lead Acid Gel
Voltage
12 V
Capacity
5 Ah
Gas discharge
Not required
Delivery condition
Ready for immediate use (Filled & Loaded)

Battery properties

Battery category
Device batteries
Battery
Rechargeable battery
Battery type
Lead–acid battery
Power capacity
5000 Wh

Origin

Country of origin
Vietnam

Voluntary climate contribution

CO₂-Emission
Climate contribution

Scope of delivery

Items per sales unit
1 x

Legal Notice

Product Safety

14-day cancellation right
30-day right of return
24 Months statutory warranty

Compare products

Goes with

Reviews & Ratings